Creating a comfortable working environment

Maldon District Council approached us with a clear challenge – keep our team cool during the summer and warm throughout the winter, all while ensuring energy-efficiency and minimal disruption to the busy office.

Free of Charge Assessment

After an initial conversation, our air-conditioning engineers Dan and Spencer attended the site free of charge to carry out a full survey of the council offices. Their assessment allowed us to design a bespoke climate-control solution tailored to the layout, occupancy, and usage of each room.

Our proposal was submitted to the Council and approved by the decision-makers without amendment – a great validation of the clarity and value of the solution.

The Solitaire Solution

Over several months, our team worked systematically through the Maldon council offices, installing new Bosch high-efficiency air conditioning systems across multiple areas including:

  • General office spaces
  • Conference and meeting rooms
  • Staff rooms
  • Reception and circulation spaces

Key features of the installation

  • Energy-efficient Bosch systems for reliable heating and cooling
  • Neat external pipework containment and professional bracketry
  • Discreet internal wall-mounted units to blend with the existing décor
  • Minimal disruption to staff, with work sequenced around office hours
  • Full commissioning and user handover so staff can easily manage temperature settings year-round
The above images show the completed outdoor condenser installations and the neat, modern indoor units providing quiet and effective climate control for staff and visitors.

Client Satisfaction

The Council expressed how impressed they were with:

  • the professionalism of our engineers,
  • the tidiness and care taken around a live working environment, and
  • the quality and performance of the installed systems.
As a result, we’ve since been asked to carry out additional works across the building – something we’re extremely proud of.

The importance of having a reliable company

Thanks to this project, Maldon District Council now benefits from:

  • Improved staff comfort year-round
  • Better air quality and temperature control
  • Reduced energy costs compared to older systems
  • A future-proofed cooling and heating solution

This project highlights our commitment to delivering high-quality, reliable climate-control systems and building long-term relationships with our clients.